Romaine-3 Project

Hydraulic Model Study of the Diversion, Spillway and Intake.

  • Client: Hydro-Québec
  • Date: 2012
Kutehr Hydroelectric Project (Himacahl Pradesh, India)

Scale Model Studies of the Spillway, Headworks, Tailworks, Desanders and Outlet Works.

  • Client: JSW Energy India
  • Date: 2012
Site C Hydroelectric Project

Hydraulic Model Study of the Spillway, Intake and Diversion Works.

  • Client: BC Hydro
  • Date: 2012
Nyamjang Chhu Hydroelectric Project

Scale Model Studies of the Headworks.

  • Client: NJC Power Ltd
  • Date: 2012
Combined cycle powerplant in Sousse (Tunisia)

Hydraulic Model Study of Discharge Water Passages and Pumping Station Cooling Water.

  • Client: SNC-LAVALIN
  • Date: 2012
Romaine-1 Project

Hydraulic Model Study of the Diversion, Spillway and Intake.

  • Client: Hydro-Québec
  • Date: 2011
Shawinigan Project

Hydraulic Model Study of the Spillway.

  • Client: Hydro-Québec
  • Date: 2011
Romaine-2 Project

Hydraulic Model Studies of the Diversion Works, Diversion Gate and Spillway.

  • Client: Hydro-Québec
  • Date: 2010
Gouin Dam

In Situ Validation of Bottom Outlet no.8 Modifications.

  • Client: Hydro-Québec
  • Date: 2010
Badrinath HydroElectric Project (India)

Hydraulic Model Study of the Alaknanda Headworks, Diversion, Spillway and Desander.

  • Client: GMR
  • Date: 2009
Shipshaw Project

Hydraulic Model Study of the Intake of the New Hydroelectric Powerhouse.

  • Client: Rio Tinto Alcan
  • Date: 2008
Strathcona Dam

Hydraulic Model Study of the Intake Structure Emergency Gates.

  • Client: BC Hydro
  • Date: 2008
Gouin Dam

Hydraulic Model Study of Bottom Outlet no.8.

  • Client: Hydro-Québec
  • Date: 2008
Upper Stave Project

Numerical Modelling of the Water Intake Flow Conditions and Sediment Transport in the Reservoir.

  • Client: Kiewit, VA Tech
  • Date: 2008
Partial Diversion of the Manouane River

Hydraulic Monitoring Program after the Diversion.

  • Client: Hydro-Québec
  • Date: 2008
Romaine Project

Numerical Modelling of the Romaine River in the Presence of Ice.

  • Client: Hydro-Québec
  • Date: 2007
Chaudières Falls Powerhouses

Forebay and Tailrace Numerical Modelling.

  • Client: Energy Ottawa
  • Date: 2008
Rupert Diversion

Final Study for the Prediction of Maximum Water Levels in Ice Conditions.

  • Client: James Bay Energy Corporation
  • Date: 2011
Orléans Island Bridge

Preliminary Numerical Modelling of hydrodynamics conditions.

  • Client: Transports Québec
  • Date: 2010
Matane River

Restoration of the Salmon Pool at Quai-de-Bois –Hydraulic Modelling of Compensatory Action.

  • Client: CIMA+
  • Date: 2007
Eastmain 1-A Powerhouse – La Sarcelle – Rupert Division

Environmental Monitoring of the Ice Conditions.

  • Client: Hydro-Québec
  • Date: winter 2011-2012
Champlain Bridge Reconstruction

Study of the Ice Regime in the Left Branch of Nun’s Island.

  • Client: Genivar
  • Date: 2012
Mining Project at Schefferville

Feasibility Study for the Design of Ice Bridges in Schefferville.

  • Client: CIMA+
  • Date: 2012
Dauphin and Fairford Rivers (Manitoba)

Numerical Modelling Studies of Hydraulic Conditions in Winter.

  • Client: Aecom
  • Date: 2011
Romaine-2 Project

Numerical Modelling of the Water Level Rise in the Murailles Basin.

  • Client: Hydro-Québec
  • Date: 2011
Ice bridges on the Nemiscau and Eastmain Rivers

Ice Bridge Design and Certification.

  • Client: CFNO
  • Date: 2011
Eastmain 1-A Powerhouse – La Sarcelle – Rupert Division

Environmental Monitoring of the Ice Conditions.

  • Client: Hydro-Québec
  • Date: winter 2010-2011
Chute-Allard

Monitoring of Frazil Ice in the Dam Forebay.

  • Client: Hydro-Québec
  • Date: 2009
Delisle River, crossing of the Soulanges canal siphon

Scale Model Study – Ice jam Problems.

  • Client: MTQ
  • Date: 2009
Rocher-de-Grand-Mère Powerhouse

Environmental Monitoring Program – Ice covers at the Saint Maurice River.

  • Client: Hydro-Québec
  • Date: 2009
La Gabelle Dam (Saint-Maurice River)

Numerical Simulation of Dam Break in Winter Conditions.

  • Client: Hydro-Québec
  • Date: 2009
Pointe-du-Buisson Basin

Numerical Modelling Study of Water Conditions in Winter (Stability of the Ice Cover and Ice Jams).

  • Client: Hydro-Québec
  • Date: 2008
SM-1 Dam (Sainte-Marguerite River)

Ice Retention System for the SM-1 Generating Station in the Upstream Reach.

  • Client: HydroMega Inc.
  • Date: 2007
LG-1 Project

Numerical Modelling of the Frazil Ice Generation and Ice Cover Formation on the La Grande River, Downstream of the LG-1 Powerhouse.

  • Client: Hydro-Québec
  • Date: 2007
Atwater plant

Scale Model Study for the Dispersion of a Disinfectant.

  • Client: Ville de Montréal
  • Date: 2011
Bertrand Creek (Montreal)

Numerical Modelling of the Watershed and the Storm Sewer System to Eliminate the Risk of Flooding and Revitalize the Creek.

  • Client: Ville de Montréal
  • Date: 2010
Jean-R.-Marcotte Wastewater Treatment Plant

Numerical Modelling of the Hydraulic Network.

  • Client: Ville de Montréal
  • Date: 2010
Jean-R.-Marcotte Wastewater Treatment Plant

Hydraulic and Structural Analysis of the emergency force main.

  • Client: Ville de Montréal
  • Date: 2009
LaSalle Main Sewer

Scale Model Study on the Flow Conditions at the Fall Structure of the 6th avenue.

  • Client: Ville de Montréal
  • Date: 2008
Domtar plant (Windsor, Ontario)

Assessment of the Clarified Effluent Outlet Capacity.

  • Client: Domtar
  • Date: 2003
Hudson Bay, Hudson Strait and Ungava Bay

Numerical Simulations of Tides and Surge Storms for Past and Future Climate.

  • Client: Ouranos
  • Date: 2012
Plaisance Bay (Magdalen Islands)

Numerical Modelling of Offshore Wave Transformation and Longshore Currents.

  • Client: Municipalité des Îles-de-la-Madeleine
  • Date: 2011
Harbour of Grande-Anse (Saguenay River, Quebec)

Assessment of Hydrodynamic Conditions in the vicinity of the Docks and Optimization of the Navigation Conditions.

  • Client: Laurentian Pilotage Authority
  • Date: 2010
Havre de Rimouski

Numerical Modelling of Offshore Wave Transformation.

  • Client: Fisheries and Oceans Canada
  • Date: 2010
Post-Panamax Ship Navigation in the St Lawrence Seaway between Montreal and Quebec City

Analysis and Modelling of Ship Waves and Potential Bank Erosion from post-Panamax Ships in the Montreal-Quebec Reach.

  • Client: Laurentian Pilotage Authority
  • Date: 2010
Havre de Gaspé

Contaminated Sediment at the Sandy beach dock Restoration Project – Numerical Modelling of the Dispersion of Dredged Sediments and Potential Impact on Mariculture Sites.

  • Client: Public Works Canada
  • Date: 2010
Highway 30 – Beauharnois canal crossing

Numerical Study for Headloss Calculations due to the Bridge for Open Water Conditions and with Ice.

  • Client: CJV Nouvelle Autoroute 30
  • Date: 2009
Gros-Cacouna Liquified Natural Gaz Terminal

Numerical Modelling of the Hydrosedimentologic Conditions to Determine the Impacts of Dredging.

  • Client: CIMA+
  • Date: 2009
Rivière-du-Loup Marina

Study of the Modification of Existing Structures to Reduce Siltation of the Marina.

  • Client: Corporation du carrefour maritime de Rivière-du-Loup
  • Date: 2009
Isle-aux-Grues Ferry Wharf

Numerical Modelling of the Hydrosedimentologic Conditions.

  • Client: Quebec Ferries Society
  • Date: 2009
Quebec City Harbour

Beauport zone expansion: Numerical Modelling of the Hydrosedimentologic Conditions.

  • Client: Administration portuaire de Québec
  • Date: 2009
Rivière-du-Loup Marsh

Numerical Modelling of Hydrodynamic Conditions and Sediment Transport along the New Extension.

  • Client: CIMA+
  • Date: 2009
Rivière-du-Loup Wharf Reconstruction

Study on Maintenance Dredging and the Dispersal Patterns of Dredged Sediments.

  • Client: Quebec Ferries Society
  • Date: 2007
Mohammedia Thermal Powerplant

Study of the Seawater Intake System and Discharge System of the Powerhouse: Numerical Modelling of Wave Agitation, Longshore Currents and Plume Dispersion.

  • Client: RSW international
  • Date: 2007
Isle-aux-Coudres Ferry Dock

Numerical Modelling and Study of the Hydrosedimentologic Conditions causing Harbour Siltation.

  • Client: Quebec Ferries Society
  • Date: 2007
Mont-Louis Harbour (Gaspesia)

Numerical Modelling of Wave Agitation.

  • Client: Public Works Canada
  • Date: 2007
Haut-Richelieu Hospital

Scale Model Study of Gas Dispersion and Chimney Releases.

  • Date: 2012
Développement Vue Project

Scale Model Study of Wind Impacts.

  • Date: 2012
4970 Place de la Savane Project

Notice on Wind Impacts.

  • Date: 2011
M9-Phase 4 Project

Notice on Wind Impacts.

  • Date: 2011
Place de la Cité Internationale Project

Scale Model Study of Wind Impacts.

  • Date: 2011
Centre Hospitalier de l’Université de Montréal (CHUM)

Numerical Modelling of Wind Conditions.

  • Date: 2011
Jewish General Hospital

Scale Model Study of Snow Conditions.

  • Date: 2011
Rouge 5 & 6 Condominium Project

Scale Model Study of Wind Impacts.

  • Date: 2010
Jonction de l’Est Staging Project

Scale Model Study of Snow Conditions.

  • Date: 2010
2-22 Sainte-Catherine Street Project

Scale Model Study of Wind Impacts.

  • Date: 2009
Modernization of the Radio-Canada building

Numerical Modelling of Wind Patterns and Scale Model Study of Snow Condition.

  • Date: 2007
Paré-de la Savane Project

Scale Model Study of Wind Impacts.

  • Date: 2007
Expansion of the Southwest terminal, Montréal International Airport

Numerical Modelling of Wind Conditions and Scale Model Study of Snow Condition.

  • Client: Hydro-Québec
  • Date: 2006